Available Forms
Reference Materials
Categories
Documents
JHVT JMVT JMVV - Control Board Replacement
Date modified: | 10/03/2022 |
Filesize: | 519.79 kB |
NL Commercial Air Handler Electric Heater installation Instructions
Date modified: | 01/25/2022 |
Filesize: | 1.88 MB |
Core Unit Belt Drive CFM Chart
Date modified: | 06/14/2021 |
Filesize: | 2.73 MB |
Core Unit Direct Drive CFM Chart
Date modified: | 06/14/2021 |
Filesize: | 1.2 MB |
Enthalpy Chart
Date modified: | 06/01/2021 |
Filesize: | 61.5 kB |
Verasys Selection Tool
Date modified: | 06/05/2018 |
Filesize: | 1.98 MB |
Clocking gas meter
Date modified: | 07/11/2014 |
Filesize: | 186.68 kB |
Clocking gas meter to measure furnace BTU input
Wiring Aspen pump to Mitsubishi
Date modified: | 07/11/2014 |
Filesize: | 148.24 kB |
Wiring schematic to wire Aspen pump to Mitsubishi
wiring AHE air handler
Date modified: | 07/11/2014 |
Filesize: | 193.83 kB |
How to wire the YORK AHE air handler
10K Thermister Values
Date modified: | 02/11/2014 |
Filesize: | 116.9 kB |
Demand Defrost Installation
Date modified: | 07/11/2014 |
Filesize: | 76.55 kB |
Residential Duct Sizing Guide
Date modified: | 03/10/2014 |
Filesize: | 36.71 kB |
GoToWebinar
Date modified: | 03/10/2014 |
Filesize: | 109.52 kB |
VA Air Retrofit Form for Retail Sales
Date modified: | 03/10/2014 |
Filesize: | 114.5 kB |
2012 York Tech Guide - Virginia Air
Date modified: | 02/10/2014 |
Filesize: | 3.76 MB |
NATE - The Value of Certification
Date modified: | 02/10/2014 |
Filesize: | 1.92 MB |
Part 1 of the Virginia Uniform Construction Code
Date modified: | 02/10/2014 |
Filesize: | 1.63 MB |
Commercial Controls Policy and Pre-Start Checklist
Date modified: | 02/07/2014 |
Filesize: | 42.13 kB |
This document is details the Virginia Air commercial controls policy developed to assist installing and mechanical contractors in understanding those areas of controls application where we can assist them or their controls contractors before, during and after installation. It also contains a Pre-Start checklist that must be completed prior to any Virginia Air assisted commissioning. The checklist can also be used by contractors to insure their own commissioning is more complete.
Commercial Controls Policy, including a Pre-Start Checklist for Commissioning
Date modified: | 02/07/2014 |
Filesize: | 42.13 kB |
This document is details the Virginia Air commercial controls policy which is assumed to be included in all commerical quotes. It also details some warranty items which may be impacted by how a unit is started. The last page is a pre-start checklist that must be completed and submitted to VA Air prior to a TSM being a part of a start up or commissioning, regardless if this is a paid, factory assisted commissioning. Contractors are also encouraged to use this internally for their own benefit.