Reference Materials

Documents

Order by : Name | Date | Hits [ Ascendant ]

Verasys Selection Tool YORK Psychrometric Chart

Date modified: 05/07/2015
Filesize: 320.48 kB

YORK Psychrometric Chart

10K Thermister Values Wiring Aspen pump to Mitsubishi

Date modified: 07/11/2014
Filesize: 148.24 kB

Wiring schematic to wire Aspen pump to Mitsubishi

10K Thermister Values wiring AHE air handler

Date modified: 07/11/2014
Filesize: 193.83 kB

How to wire the YORK AHE air handler

Verasys Selection Tool Verasys Selection Tool

Date modified: 06/05/2018
Filesize: 1.98 MB

10K Thermister Values VA Air Retrofit Form for Retail Sales

Date modified: 03/10/2014
Filesize: 114.5 kB

10K Thermister Values Residential Duct Sizing Guide

Date modified: 03/10/2014
Filesize: 36.71 kB

10K Thermister Values NATE - The Value of Certification

Date modified: 02/10/2014
Filesize: 1.92 MB

10K Thermister Values JHVT JMVT JMVV - Control Board Replacement

Date modified: 10/03/2022
Filesize: 519.79 kB

10K Thermister Values GoToWebinar

Date modified: 03/10/2014
Filesize: 109.52 kB

10K Thermister Values Furnace flame simulator

Date modified: 07/11/2014
Filesize: 178.2 kB

Build your own flame simulator

10K Thermister Values Enthalpy Chart

Date modified: 10/13/2015
Filesize: 59.43 kB

Enthalpy Chart

10K Thermister Values Enthalpy Chart

Date modified: 06/01/2021
Filesize: 61.5 kB

10K Thermister Values Demand Defrost Installation

Date modified: 07/11/2014
Filesize: 76.55 kB

10K Thermister Values Core Unit Direct Drive CFM Chart

Date modified: 06/14/2021
Filesize: 1.2 MB

10K Thermister Values Core Unit Belt Drive CFM Chart

Date modified: 06/14/2021
Filesize: 2.73 MB

10K Thermister Values Commercial Controls Policy, including a Pre-Start Checklist for Commissioning

Date modified: 02/07/2014
Filesize: 42.13 kB

This document is details the Virginia Air commercial controls policy which is assumed to be included in all commerical quotes.  It also details some warranty items which may be impacted by how a unit is started.  The last page is a pre-start checklist that must be completed and submitted to VA Air prior to a TSM being a part of a start up or commissioning, regardless if this is a paid, factory assisted commissioning.  Contractors are also encouraged to use this internally for their own benefit. 

10K Thermister Values Commercial Controls Policy and Pre-Start Checklist

Date modified: 02/07/2014
Filesize: 42.13 kB

This document is details the Virginia Air commercial controls policy developed to assist installing and mechanical contractors in understanding those areas of controls application where we can assist them or their controls contractors before, during and after installation.  It also contains a Pre-Start checklist that must be completed prior to any Virginia Air assisted commissioning.  The checklist can also be used by contractors to insure their own commissioning is more complete.  

10K Thermister Values Clocking gas meter

Date modified: 07/11/2014
Filesize: 186.68 kB

Clocking gas meter to measure furnace BTU input

ACCA Manual D Speedsheet ACCA Manual D Speedsheet

Date modified: 05/21/2015
Filesize: 1.96 MB

ACCA Manual D Speedsheet

10K Thermister Values 2012 York Tech Guide - Virginia Air

Date modified: 02/10/2014
Filesize: 3.76 MB

10K Thermister Values 10K Thermister Values

Date modified: 02/11/2014
Filesize: 116.9 kB

An independent distributor of York, Virginia Air proudly supports the following major brands: